How Engineering Change Orders (ECOs) Improve Projects


Engineering design changes refer to modifications or alterations made to the design of a product, system, or component during the engineering and development process. These changes can occur at various stages, including the conceptual design phase, detailed design phase, or even after the product has been released.

Engineering design changes are implemented to improve the functionality, performance, quality, manufacturability, or other aspects of the product. They may be driven by factors such as customer feedback, design flaws, technological advancements, regulatory requirements, cost optimization, or market demands.

In this article, we’ll examine ECOs and consider what designers and other stakeholders need to do to manage changes properly.Often, design for manufacturability (DFM) flags issues that require engineering changes — and when you request a quote from Be-Cu.com, you get expert DFM feedback up front so you can avoid project delays and budget overruns.

The Engineering Change Orders – What Is Engineering Change Orders?


Engineering Change Orders (ECOs) are formal documents used to initiate and manage changes to engineering designs, specifications, or processes. An Engineering Change Order is a structured request or notification that outlines the proposed change, its rationale, and the necessary steps to implement the change. ECOs are commonly used in industries such as manufacturing, engineering, and product development to ensure controlled and effective management of changes.Key elements typically included in an Engineering Change Order are:

  • Change Description: A clear and detailed description of the proposed change, including the specific aspects of the design, specifications, or processes that need modification.
  • Reason for Change: The justification or rationale behind the proposed change. This could be driven by factors such as customer feedback, design flaws, market demands, cost optimization, quality improvement, regulatory compliance, or technological advancements.
  • Impact Assessment: An evaluation of the potential impact of the proposed change on various aspects such as product functionality, performance, quality, cost, manufacturability, supply chain, schedule, or regulatory compliance. This assessment helps stakeholders understand the implications of the change before making a decision.
  • Change Implementation Plan: The steps and activities required to implement the proposed change. This includes details about who will perform the tasks, the timeline for implementation, any required resources or materials, and any associated costs.
  • Documentation Updates: Identification of the documents or records that need to be updated as a result of the change, such as engineering drawings, specifications, manufacturing instructions, quality control procedures, or documentation related to compliance or certification.
  • Review and Approval Process: The ECO includes a review and approval process to ensure that the change is evaluated by relevant stakeholders, such as engineering, manufacturing, quality assurance, procurement, or regulatory compliance teams. The approval process may involve multiple levels of review and sign-off, depending on the organization’s change management procedures.
  • Change Tracking and Communication: A mechanism for tracking the progress and status of the change throughout the implementation process. This includes recording any updates, revisions, or deviations from the original plan. Effective communication of the change and its implications to relevant stakeholders is crucial to ensure a smooth transition.

By utilizing Engineering Change Orders, organizations can establish a formal and controlled process for managing changes. ECOs help prevent ad-hoc modifications, maintain accurate documentation, assess the impact of changes, mitigate risks, ensure proper approvals, and facilitate effective communication among project teams and stakeholders. They play a vital role in maintaining product integrity, quality control, and efficient project management.

The Steps Of Engineering Change Orders (ECOs) Improve Projects


The process of engineering design changes typically involves the following steps:

Identification of the Need for Change: The need for a design change is identified through various means, such as feedback from customers, internal testing, quality issues, market research, or regulatory updates. The change could be minor, such as a cosmetic adjustment, or significant, such as a major design overhaul.
Evaluation and Impact Analysis: The proposed change is evaluated to determine its feasibility and potential impact on the product. This includes assessing the technical feasibility, cost implications, manufacturing considerations, potential risks, and compliance with regulations or standards.
Design Modification: Based on the evaluation, the engineering design is modified to incorporate the desired change. This may involve altering the dimensions, materials, features, components, or assembly methods of the product. Computer-aided design (CAD) software is commonly used to make these modifications.
Documentation and Communication: The design change is documented, including the rationale behind the change, the specific modifications made, and any relevant technical details. This documentation serves as a reference for future use and for communicating the change to other stakeholders, such as manufacturing teams, suppliers, or regulatory authorities.
Validation and Verification: The modified design is tested and verified to ensure that the change has achieved the desired objectives and does not introduce new issues or risks. This may involve computer simulations, prototyping, testing, or analysis to validate the performance, functionality, safety, and compliance of the modified design.
Implementation and Integration: Once the modified design has been validated, it is integrated into the overall product development process. This may involve updating manufacturing documentation, tooling, production processes, or assembly procedures to accommodate the design change.
Change Control and Documentation Updates: The design change is managed through a change control process to ensure proper tracking, documentation, and communication. The documentation, including engineering drawings, specifications, and other relevant documents, is updated to reflect the modified design.

Engineering design changes are an integral part of the product development lifecycle, allowing for continuous improvement, adaptation to evolving requirements, and addressing issues or opportunities identified throughout the design and development process.

Why Use ECOs for Engineering Design Changes?


Using Engineering Change Orders (ECOs) for engineering design changes provides several benefits and advantages in managing and implementing changes effectively. Here are some key reasons to use ECOs:

  • Formal Process: ECOs establish a formal and structured process for managing engineering design changes. This process ensures that changes are evaluated, reviewed, and authorized in a controlled manner, rather than making ad-hoc modifications. A formal process reduces the chances of errors, inconsistencies, or unauthorized changes, ensuring that modifications align with project goals and objectives.
  • Documentation and Traceability: ECOs require proper documentation of the proposed change, including the rationale, impact analysis, and implementation plan. This documentation creates a clear and auditable trail of changes, providing a historical record of modifications. It facilitates tracking, traceability, and accountability throughout the project lifecycle, which is valuable for compliance, quality control, and future analysis.
  • Impact Assessment: ECOs facilitate a comprehensive assessment of the potential impact of design changes. The proposed modifications are evaluated for their technical feasibility, cost implications, schedule impacts, manufacturability considerations, and compliance with regulations or standards. This helps in making informed decisions and understanding the consequences of changes before implementation.
  • Change Control: ECOs establish a controlled change management process. They ensure that changes are properly reviewed, approved, and communicated to relevant stakeholders. The change control process helps in coordinating efforts, managing resources, and maintaining project timelines. It prevents unauthorized or unplanned changes, ensuring that modifications are aligned with project goals and objectives.
  • Risk Mitigation: ECOs provide a mechanism for evaluating and mitigating risks associated with engineering design changes. Through impact assessments and proper evaluation of proposed modifications, potential risks and negative consequences can be identified and addressed before implementation. This proactive approach minimizes the likelihood of errors, failures, or adverse impacts on project quality, cost, or schedule.
  • Collaboration and Communication: ECOs promote effective collaboration and communication among project team members and stakeholders. They provide a centralized platform for documenting and communicating changes, ensuring that all relevant parties are aware of modifications and their impact. ECOs foster transparency, enhance coordination, and facilitate discussions, reviews, and approvals among different teams or departments involved in the project.
  • Continuous Improvement: ECOs contribute to a culture of continuous improvement. By capturing lessons learned from change processes and implementing corrective actions, project teams can enhance their change management practices. ECOs provide an opportunity for post-implementation reviews, analysis of the effectiveness of changes, and identification of areas for improvement in future projects.

Using ECOs for engineering design changes ensures a systematic and controlled approach to manage modifications. They improve documentation, traceability, risk mitigation, collaboration, and decision-making throughout the project lifecycle. By implementing a formal change management process, organizations can adapt to evolving requirements, enhance project performance, and maintain product integrity and quality.

What Happens Without ECOs?


Without the use of Engineering Change Orders (ECOs) or a formal change management process, several challenges and issues can arise in managing engineering design changes. Here are some potential consequences of not having ECOs:

  • Ad-Hoc Changes: Without ECOs, changes to engineering designs may occur in an ad-hoc manner, with individuals making modifications without following a structured process. This can lead to inconsistencies, undocumented changes, and a lack of transparency in understanding who made the changes and why.
  • Lack of Documentation: The absence of ECOs means there is no formal documentation of engineering design changes. This leads to a lack of traceability and makes it difficult to track and understand the evolution of the design. It becomes challenging to refer back to previous versions, understand the reasoning behind changes, or conduct post-change analysis.
  • Inconsistent Implementation: Without a formal process, engineering design changes may be implemented inconsistently. Different individuals or teams may interpret changes differently or make modifications without proper coordination. This can result in discrepancies, conflicts, or incompatible changes that impact product functionality, quality, or performance.
  • Increased Risk of Errors: Ad-hoc changes and a lack of proper documentation increase the risk of errors. Without a structured process for evaluating and assessing the impact of changes, there is a higher likelihood of introducing design flaws, compatibility issues, or regulatory non-compliance. This can lead to costly rework, product failures, or customer dissatisfaction.
  • Lack of Coordination and Communication: Without ECOs, there is a lack of coordination and communication among stakeholders involved in the engineering design changes. Changes may be implemented without informing relevant parties, leading to confusion, conflicts, or missed opportunities for valuable input or expertise. This can hinder collaboration and negatively impact project outcomes.
  • Project Delays and Cost Overruns: The absence of a formal change management process can result in project delays and cost overruns. Changes that are not properly evaluated, planned, or communicated can disrupt project timelines, require additional resources, or result in unplanned rework. This affects project schedules, budgets, and overall project performance.
  • Quality and Compliance Issues: Without a structured process for change control, there is a higher risk of overlooking quality assurance and regulatory compliance requirements. Changes made without proper evaluation or documentation may not undergo the necessary validation or verification processes, leading to compromised product quality or non-compliance with industry standards or regulations.
  • Difficulty in Reverting Changes: In the absence of proper documentation and traceability, reverting or undoing changes becomes challenging. If a change leads to unintended consequences or undesirable outcomes, it can be difficult to pinpoint the exact modifications made or their impact, making it harder to rectify the situation efficiently.

Implementing ECOs or a formal change management process helps mitigate these issues by providing a structured approach to evaluate, document, communicate, and implement engineering design changes. ECOs ensure proper coordination, traceability, risk management, and adherence to quality standards, contributing to smoother project execution and better product outcomes.

Who Are the Stakeholders in Engineering Change Management?


Engineering change management involves multiple stakeholders who play different roles throughout the change process. Here are some key stakeholders commonly involved in engineering change management:

  • Design Engineers: Design engineers are responsible for proposing and implementing engineering design changes. They identify areas for improvement, evaluate the feasibility of changes, and make modifications to the design. Design engineers collaborate with other stakeholders to ensure the proposed changes align with project goals and requirements.
  • Project Managers: Project managers oversee the entire change management process. They coordinate the efforts of various stakeholders, manage project timelines and resources, and ensure that changes are implemented efficiently and effectively. Project managers facilitate communication, monitor progress, and ensure that the change process aligns with the overall project objectives.
  • Manufacturing Engineers: Manufacturing engineers are involved in evaluating the impact of design changes on the manufacturing process. They assess the feasibility of implementing the changes on the production floor, review tooling requirements, and analyze the potential impact on production schedules, costs, and resources. Manufacturing engineers collaborate with design engineers to ensure that changes can be smoothly integrated into the manufacturing process.
  • Quality Assurance/Control: Quality assurance or quality control teams play a vital role in engineering change management. They assess the impact of design changes on product quality and compliance with standards and regulations. They review the proposed changes, conduct inspections or tests, and ensure that the modified design meets quality requirements. Quality teams may also be responsible for validating and verifying the changes through testing and analysis.
  • Procurement/Supply Chain: The procurement or supply chain team evaluates the impact of design changes on the supply chain and procurement processes. They assess the availability of materials, components, or equipment required for implementing the changes. They may coordinate with suppliers, assess the impact on costs and lead times, and ensure that the necessary resources are available for the change implementation.
  • Operations/Production: Operations or production teams are involved in implementing the changes on the shop floor. They work closely with manufacturing engineers to ensure a smooth transition and minimize disruptions to ongoing production. They may provide input on process modifications, assembly procedures, and training requirements to accommodate the changes effectively.
  • Regulatory Compliance: Regulatory compliance teams assess the impact of design changes on regulatory requirements and standards. They ensure that the modified design complies with applicable regulations, certifications, or safety standards. They may review documentation, conduct audits, or provide guidance on meeting compliance requirements.
  • Customer/End Users: Customers or end users may also be stakeholders in engineering change management, especially if the proposed changes are driven by customer feedback or requirements. Their input is valuable in identifying areas for improvement and evaluating the impact of changes on usability, functionality, or customer satisfaction.

Effective communication, collaboration, and coordination among these stakeholders are crucial for successful engineering change management. Involving the right stakeholders at the appropriate stages of the change process ensures that the changes are evaluated from multiple perspectives, risks are mitigated, and the changes are implemented in a manner that aligns with project objectives and stakeholder requirements.